Gallery:
 
 
 
  Replacement footbridge at the Church of All Saints in West Lavington Wiltshire. This was a complete demolition and rebuild project.
    Borehole drilling to 60 meters for a Ground Source Heat Recovery system which is common in Scandinavia. Also the sinking of large Rainwater Harvesting tanks at the same site.
  Large 4 bay garage constructed in stone featuring a slate roof to satisfy stringent planning conditions in a conservation area.
   
  The installation of an underground Gas tank for one of our clients. Disruption to the garden was kept to a minimum during excavation and eventually only the access cover will be visible.